GENEsee community college
The Sports Arena at GCC was completed in 2017. Burnett was sub-contracted by Allied and Building Innovations Group to handle the facility's steel construction, siding, roofing systems, and framing. The building has a variety of unique features including skylights, insulated architectural panels, a large open span, and a number of hips. This CEKO design includes two buildings totaling over 25,000 sq ft.